KLH – ERIE WATER WORKS ASBURY TANK BOOSTER PUMP STATION
Erie, PA
Scope:
Electrical design for new municipal water pumping station
Services:
Power distribution, Underground duct banks, Lighting, Emergency Power, Instrumentation
Completed:
December 2025
HAYES DESIGN GROUP – WBCA NEW ADMINISTRATION BUILDING
Zelienople, PA
Scope:
Electrical design for new administration building
Services:
Power distribution, Lighting, Roof mounted photovoltaic system
Completed:
December 2025
RENTRICITY – CALIFORNIA AMERICA HIGHLAND TANK HYDRO TURBINE PROJECT
San Diego, CA
Scope:
Electrical design for two grid connected hydro turbines servicing a municipal water distribution in Southern California
Services:
Power distribution design, Control panel design, Control system functional system development, Onsite startup and commissioning
Completed:
January 2025
AQUA – SHENANGO WATER TREATMENT PLANT MAIN TRANSFORMER REPLACEMENT PROJECT
Sharon, PA
Scope:
Electrical design to support the replacement of the main 69kV – 4.16kV service transformer at a water treatment plant
Services:
Bidding and construction documents, Startup and installation support
Completed:
February 2025
UNALASKA WATER TREATMENT FACILITY
City of Unalaska, AK
Scope:
Installation of an energy recovery hydrogenerator system consisting of two hydroturbines installed at a city owned water treatment faciity.
Services:
Electrical system design, custom control panel design, assisted with operations strategy, onsite start-up and commissioning.
Completed:
December 2021
3rd Floor PET CT Replacement
Washington, PA
Scope:
Replacement of the PET CT equipment for a regional hospital system.
Services:
Electrical design of light panels with scenes, cove lighting, and new lighting throughout area. Provided electrical construction administration.
Completed:
Completed December 2019
Care Center For Family and Birth and Women’s Health LDR and Postpartum Renovations
Washington, PA
Scope:
21,000 sq. ft. renovation of the LDR and Postpartum wings for a regional hospital system.
Services:
Electrical design and construction administration for various systems such as nurse call, fetal monitoring, paging, music, security, patient tracking, and infant abduction.
Completed:
March 2020
Bully Max
Allison Park, PA
Scope:
Civil, electrical, and structural engineering and design of a 28,000 ft2 warehouse building.
Services:
Engineering design, permitting, land development, retaining wall, foundations, PEMB erection, and interior build-out.
Completed:
Ongoing
Slovan Volunteer Fire Department
Burgettstown Borough
Scope:
Civil, electrical, and structural engineering and design of a new volunteer fire department, 3660 ft2 office and 5340 ft2 garage.
Services:
Engineering design, permitting, land development, foundations, PEMB erection, and interior build-out
Completed:
February 2022
Southwest Greens
Scope:
Electrical and structural engineering and design of a warehouse building specific to the client.
Services:
Engineering design, permitting, foundations, and interior build-out design.
Completed:
June 2022
Waste Water Treatment
Dubois, PA
Scope:
Construction of a new chemical storage building with secondary containment.
Services:
Complete engineering design and construction. Split-face block building on continuous foundation with a concrete slab including secondary containment trench and standing seam metal roof system. Electrical power, control wiring and lighting system. Heating and ventilation system.
Completed:
July 2022
Replacement of the Little Shady Avenue Bridge
Burgettstown Borough
Scope:
An existing conventional steel bridge constructed in the 1940s was demolished and replaced with a pre-cast box culvert.
Services:
Preparation of detailed design plans and specifications for permitting and construction. Redcon assisted the Borough with the public bid process, construction management, and administration process for a grant. The Borough was awarded a $150,000 grant through the Local Share Account with the County.
Completed:
November 2021
2021 Paving Program
Burgettstown Borough, Washington County, PA
Scope:
Reconstruction of six (6) roads within the Borough including paving and drainage improvements.
Services:
Development of a long-term capital improvement plan for the Borough, preparation of detailed technical specifications for construction, and assisting the Borough with the public bid process.
Completed:
October 2021
Yverdon Paving Project
Wormleysburg Borough, Cumberland County, PA
Scope:
Milling and asphalt overlay for 0.5 miles of road
Services:
Development of a detailed detour plan for residents during construction. Preparation of detailed technical specifications for construction, assisting the Borough with the public bid process, and resident observation during construction.
Completed:
July 2020
Municipal Building Bathroom Restoration
Robinson Township (Washington County, PA)
Scope:
Demolishing existing non-ADA compliant restroom facilities and installing new ADA compliant men’s and women’s rooms.
Services:
Demolition of walls, plumbing fixtures, design, and installation of new plumbing, restroom fixtures, tile floor, ceiling tiles, doors, and painting.
Completed:
October 2021